{"id":14905,"date":"2020-08-03T00:00:00","date_gmt":"2020-08-03T00:00:00","guid":{"rendered":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/"},"modified":"2025-06-30T14:48:46","modified_gmt":"2025-06-30T14:48:46","slug":"high-performance-test-facility-control-system-upgrade","status":"publish","type":"our_work","link":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/","title":{"rendered":"High Performance Test Facility Control System Upgrade"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\" id=\"h-upgrading-the-system\">Upgrading the System<\/h3>\n\n\n\n<p>The customer had a system that was in danger of failing completely. The system was not only outdated, but any offline node would take down the entire system and was no longer a supported platform. In fact, the system completely stopped working the day the demolition of the upgrade began. The customer needed an integrator who could not only manage a system upgrade that was three&nbsp;years in duration but also handle the very challenging mechanical and electrical requirements of the system. DMC\u2019s multi-disciplinary team was a great fit for this project.<\/p>\n\n\n\n<p>Our engineers started with a complete system of functional requirements and design phase. We used the complete specifications to develop the SCADA, PLC, and data acquisition components of the system.<\/p>\n\n\n\n<p>DMC\u2019s team completed the implementation of the system from start to finish and met the go-live date required for the client\u2019s operational needs.<\/p>\n\n\n\n<p>We performed simulation and complete FAT (factory application test) prior to the delivery of the system on-site to reduce time and expenses onsite. This was critical to the success of the project since the location and facility requirements are much more challenging to \u201ctest in the field\u201d methodologies. Once the simulation was complete, we went on-site and installed the system.<\/p>\n\n\n\n<p>We programmed <a href=\"\/services\/manufacturing-automation-and-intelligence\/plc-programming\/siemens-s7-plc-programming\">Siemens S7 1517 TF PLCs<\/a> to control the system, where there were over 20 axes operating on&nbsp;one PLC.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-reliability-improvements\">Reliability Improvements<\/h3>\n\n\n\n<p>This system now has much-improved&nbsp;reliability. With the old system, if one node failed, it would take down the entire facility. DMC built a new, modular system such that a single failure would not take the entire system down.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-native-redundancy\">Native Redundancy<\/h3>\n\n\n\n<p>&nbsp;We used <a href=\"\/services\/manufacturing-automation-and-intelligence\/hmi-and-scada-programming\/wincc-open-architecture-development\">WinCC OA<\/a> as the <a href=\"\/services\/manufacturing-automation-and-intelligence\/hmi-and-scada-programming\">SCADA<\/a> user interface in a redundant configuration which allowed the continued operation if one server fails. The redundant configuration also allows the ability to update the system without taking it offline. The redundancy appears completely seamless to the user. Deploying the system as redundant was a trivial change to configuration files. This allowed us to perform the development against a normal non-redundant system and seamlessly implement redundancy during FAT. The system now runs seamlessly with either server active.<\/p>\n\n\n\n<p>Further, the WinCC OA SCADA system provided Siemens native driver support as well as OPC UA server and client support.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-data-acquisition-system\">Data Acquisition System<\/h3>\n\n\n\n<p>The client\u2019s requirement of collecting system position data at 10 kHz is outside the bounds of what is possible in a PLC based system alone. As a <a href=\"https:\/\/www.dmcinfo.com\/about\/partners\/ni-integration-partner\/\">NI Alliance Partner<\/a> with extensive <a href=\"\/services\/test-and-measurement-automation\/labview-programming\">LabVIEW expertise<\/a>, we were able to program a <a href=\"\/services\/test-and-measurement-automation\/labview-programming-for-real-time-and-fpga\">NI cRIO<\/a> data acquisition system to capture this high-speed data. We integrated the NI cRIO system with the Siemens PLCs with PROFINET, the native Siemens PLC communication protocol. By connecting the encoder feedback to the cRIO and the cRIO to the Siemens PLC via PROFINET, we were able to collect the required 10 kHz encoder data and provide lower speed data to the S7 1517TF PLC via PROFINET for closed-loop position control.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165715\/full-system-diagram-web-version.png\" alt=\"\"\/><\/figure>\n\n\n\n<p>Learn more about DMC\u2019s <a href=\"\/services\/manufacturing-automation-and-intelligence\/motion-control-engineering-and-servo-systems\/siemens-simotion-programming\">Manufacturing Automation<\/a>&nbsp;and <a href=\"\/services\/test-and-measurement-automation\">Test &amp; Measurement<\/a> services. <a href=\"\/contact\">Contact us<\/a> with project inquiries.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Upgrading the System The customer had a system that was in danger of failing completely. The system was not only outdated, but any offline node would take down the entire system and was no longer a supported platform. In fact, the system completely stopped working the day the demolition of the upgrade began. The customer [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":14900,"template":"","meta":{"customer":"RT&amp;T REAPR","summary":"<p><img alt=\"\" class=\"services-image-right\" src=\"https:\/\/www.dmcinfo.com\/wp-content\/uploads\/2025\/05\/SIMATIC-HMI-Panel-example-display_1.jpg\" \/>DMC upgraded the control system for a large testing facility in the defense industry. This facility consisted of several&nbsp;large control applications over a distributed, mile-long, installation. Each location had its own functional purpose and independent control system but needed to work together as a seamless whole. The previous system would take down the entire facility if one of the controllers failed. As a result, a chief design goal of the new system was to provide continued operation to the system as a whole in case of hardware failure. In addition, key elements of the system were made redundant to increase reliability.<\/p>\r\n\r\n<p>The system had ambitious requirements for motor positioning, data collection rate, and&nbsp;robustness. To meet these goals, we chose Siemens S7 1500 series technology failsafe CPUs and Siemens G120 VFD drives with absolute position encoders for system control, NI cRIO DAQ for high-speed data acquisition, and WinCC OA for distributed supervisory control operations.&nbsp;<\/p>\r\n","description":"","customer_benefits":"<ul>\r\n <li>SCADA HMI with dramatically improved user experience and meaningful graphical representations<\/li>\r\n <li>Local &ldquo;machine level&rdquo; Comfort and Mobile panel HMIs provided a level of localized setup control that was not previously available. Staff can now use a handheld terminal to perform many options safely in line of sight that could not be accomplished from the restricted visibility control room.<\/li>\r\n <li>10 KHz data collection synchronized to UTC time<\/li>\r\n <li>Distributed control system and SCADA system redundancy improved reliability<\/li>\r\n <li>Distributed control system designed so that one of the sites going offline does not affect the rest of the system<\/li>\r\n <li>Modern equipment allows for better diagnostics, easier device replacement, and system adaptation over time as new use cases are found<br \/>\r\n &nbsp;<\/li>\r\n<\/ul>\r\n","components_used":"<ul>\r\n <li><a href=\"\/services\/manufacturing-automation-and-intelligence\/plc-programming\/siemens-s7-plc-programming\">Siemens S7 1517TF PLC<\/a><\/li>\r\n <li>Siemens Remote I\/O<\/li>\r\n <li><a href=\"\/services\/manufacturing-automation-and-intelligence\/motion-control-engineering-and-servo-systems\/siemens-simotion-programming\">Siemens G120 Drives<\/a><\/li>\r\n <li>Siemens KP8 Panels<\/li>\r\n <li>Siemens Comfort Panels<\/li>\r\n <li>Siemens Mobile Panels<\/li>\r\n <li>Siemens <a href=\"\/services\/manufacturing-automation-and-intelligence\/plc-programming\/safety-plc-programming\">Safety Integrated Components<\/a><\/li>\r\n <li><a href=\"\/services\/manufacturing-automation-and-intelligence\/hmi-and-scada-programming\/wincc-open-architecture-development\">Siemens WinCC OA<\/a><\/li>\r\n <li>Siemens IPCs<\/li>\r\n <li><a href=\"\/services\/test-and-measurement-automation\/labview-programming\">NI LabVIEW<\/a><\/li>\r\n <li><a href=\"\/services\/test-and-measurement-automation\/labview-programming-for-real-time-and-fpga\">NI cRIO<\/a>&nbsp;<\/li>\r\n<\/ul>\r\n","project":"","author":"Leon Grossman","notes":""},"work_category":[707,695,685,680,691,681,682,684],"class_list":["post-14905","our_work","type-our_work","status-publish","has-post-thumbnail","hentry","work_category-aerospace-and-defense","work_category-hmi-and-scada","work_category-labview","work_category-manufacturing-automation-and-intelligence","work_category-motion-control","work_category-plc-programming","work_category-siemens-plc","work_category-test-measurement-automation"],"yoast_head":"<title>High Performance Test Facility Control System Upgrade | DMC, Inc.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"High Performance Test Facility Control System Upgrade\" \/>\n<meta property=\"og:description\" content=\"Upgrading the System The customer had a system that was in danger of failing completely. The system was not only outdated, but any offline node would take down the entire system and was no longer a supported platform. In fact, the system completely stopped working the day the demolition of the upgrade began. The customer [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/\" \/>\n<meta property=\"og:site_name\" content=\"DMC, Inc.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/DMC-Inc\/107982009242929\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-30T14:48:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/\",\"url\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/\",\"name\":\"High Performance Test Facility Control System Upgrade | DMC, Inc.\",\"isPartOf\":{\"@id\":\"https:\/\/www.dmcinfo.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg\",\"datePublished\":\"2020-08-03T00:00:00+00:00\",\"dateModified\":\"2025-06-30T14:48:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage\",\"url\":\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg\",\"contentUrl\":\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg\",\"width\":1400,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Work\",\"item\":\"https:\/\/www.dmcinfo.com\/our-work\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"High Performance Test Facility Control System Upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.dmcinfo.com\/#website\",\"url\":\"https:\/\/www.dmcinfo.com\/\",\"name\":\"DMC, Inc.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.dmcinfo.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.dmcinfo.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.dmcinfo.com\/#organization\",\"name\":\"DMC, Inc.\",\"url\":\"https:\/\/www.dmcinfo.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.dmcinfo.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27171146\/dmc-logo-1.png\",\"contentUrl\":\"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27171146\/dmc-logo-1.png\",\"width\":418,\"height\":167,\"caption\":\"DMC, Inc.\"},\"image\":{\"@id\":\"https:\/\/www.dmcinfo.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/DMC-Inc\/107982009242929\",\"https:\/\/www.instagram.com\/dmcengineering\",\"https:\/\/www.youtube.com\/DMCEngineering\",\"https:\/\/www.linkedin.com\/company\/dmc-engineering\"]}]}<\/script>","yoast_head_json":{"title":"High Performance Test Facility Control System Upgrade | DMC, Inc.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/","og_locale":"en_US","og_type":"article","og_title":"High Performance Test Facility Control System Upgrade","og_description":"Upgrading the System The customer had a system that was in danger of failing completely. The system was not only outdated, but any offline node would take down the entire system and was no longer a supported platform. In fact, the system completely stopped working the day the demolition of the upgrade began. The customer [&hellip;]","og_url":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/","og_site_name":"DMC, Inc.","article_publisher":"https:\/\/www.facebook.com\/pages\/DMC-Inc\/107982009242929","article_modified_time":"2025-06-30T14:48:46+00:00","og_image":[{"width":1400,"height":500,"url":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/","url":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/","name":"High Performance Test Facility Control System Upgrade | DMC, Inc.","isPartOf":{"@id":"https:\/\/www.dmcinfo.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage"},"image":{"@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage"},"thumbnailUrl":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg","datePublished":"2020-08-03T00:00:00+00:00","dateModified":"2025-06-30T14:48:46+00:00","breadcrumb":{"@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#primaryimage","url":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg","contentUrl":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27165716\/unnamed-file-99-1.jpg","width":1400,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/www.dmcinfo.com\/our-work\/high-performance-test-facility-control-system-upgrade\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Work","item":"https:\/\/www.dmcinfo.com\/our-work\/"},{"@type":"ListItem","position":2,"name":"High Performance Test Facility Control System Upgrade"}]},{"@type":"WebSite","@id":"https:\/\/www.dmcinfo.com\/#website","url":"https:\/\/www.dmcinfo.com\/","name":"DMC, Inc.","description":"","publisher":{"@id":"https:\/\/www.dmcinfo.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.dmcinfo.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.dmcinfo.com\/#organization","name":"DMC, Inc.","url":"https:\/\/www.dmcinfo.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.dmcinfo.com\/#\/schema\/logo\/image\/","url":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27171146\/dmc-logo-1.png","contentUrl":"https:\/\/cdn.dmcinfo.com\/wp-content\/uploads\/2025\/05\/27171146\/dmc-logo-1.png","width":418,"height":167,"caption":"DMC, Inc."},"image":{"@id":"https:\/\/www.dmcinfo.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/DMC-Inc\/107982009242929","https:\/\/www.instagram.com\/dmcengineering","https:\/\/www.youtube.com\/DMCEngineering","https:\/\/www.linkedin.com\/company\/dmc-engineering"]}]}},"_links":{"self":[{"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/our_work\/14905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/our_work"}],"about":[{"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/types\/our_work"}],"author":[{"embeddable":true,"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/users\/8"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/media\/14900"}],"wp:attachment":[{"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/media?parent=14905"}],"wp:term":[{"taxonomy":"work_category","embeddable":true,"href":"https:\/\/www.dmcinfo.com\/wp-json\/wp\/v2\/work_category?post=14905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}